top of page

USDOT Awarded competitive bid to the Municipality of Guaynabo

In 2012, the U.S. Department of Transportation granted the Autonomous Municipality of Guaynabo with competitive funds ($10M) for the Project Caparra Intersection System Improvements.

CMA worked with the Municipality in the conceptual stages of the design and provided support for the preparation of the grant proposal. After the award, CMA developed all stages of the design and Construction Documents.

The Project includes improvements to the PR-165 / PR-2 / PR-23 / Fort Buchanan intersection and traffic signal system, addition of auxiliary lanes, pavement rehabilitation, reconstruction of sidewalks, improvements to pedestrian crossings, relocation of Metropolitan Bus Authority bus stop, and Maintenance of Traffic.

In addition to design services, CMA provided construction supervision and prepared the Base Condition Report for the stipulated Measurements of Effectiveness, including motorized and non-motorized traffic volume, travel time and delay, and safety.

For additional information see www.cmapr.com.

Featured Posts
Recent Posts
Search By Tags
bottom of page